The scope consists of a three phased equipment demo and replacement project to theNorwalk La Mirada Unified School District Central Kitchen.
Project 1: Replace existing pizza oven with a new thaw box.
Project 2: Includes the addition of two rack ovens to be installed adjacent to the existing ovens. The ovens requires a vented hood to the outside, a new floor drain, and modifications to the existing roof.
Project 3: Includes the replacement of the double compartment dish washing sink with a new three compartment sink with drainboards. Part 3 also includes the replacement of a commercial high temperature dishwasher.
The construction is scheduled for June 2014. The project also
requires upgrades to the existing restrooms; fire alarm system and parking lot.