• HOME
  • ANNOUNCEMENT
  • PROJECTS
    • EDUCATION
    • MASTERPLAN
    • HEALTHCARE
    • RESIDENTIAL
    • OTHER PROJECTS
  • About
  • Contact

Clerkin & Clerkin Architects

  • HOME
  • ANNOUNCEMENT
  • PROJECTS
    • EDUCATION
    • MASTERPLAN
    • HEALTHCARE
    • RESIDENTIAL
    • OTHER PROJECTS
  • About
  • Contact

NORWALK LA-MIRADA UNIFIED SCHOOL DISTRICT CENTRAL KITCHEN RENOVATION

The scope consists of a three phased equipment demo and replacement project to theNorwalk La Mirada Unified School District Central Kitchen.

Project 1: Replace existing pizza oven with a new thaw box.

Project 2: Includes the addition of two rack ovens to be installed adjacent to the existing ovens. The ovens requires a vented hood to the outside, a new floor drain, and modifications to the existing roof.

Project 3: Includes the replacement of the double compartment dish washing sink with a new three compartment sink with drainboards. Part 3 also includes the replacement of a commercial high temperature dishwasher.

The construction is scheduled for June 2014. The project also
requires upgrades to the existing restrooms; fire alarm system and parking lot.

1.jpg
4.JPG
2.JPG
3.jpg
Resize of Resize of C&C Logo.jpg